After the concrete was poured at the weekend, work has now started on the sub-dpc blockwork & brickwork. Focusing at this point on straight lines and consistent cavity width will mean that everything that follows should be in line. Once up to the damp proof course the pre-cast concrete beams can be laid out to create an instant working platform without the need to leave site and wait for the a concrete slab to cure.